Racer Properties Information Hub
Fiero Industrial Land
Fiero Industrial Land, part of the former Fisher Body Plant, is located in Pontiac along E. Kennett Road, near the larger GM Pontiac North Campus and is zoned M-2, Heavy Manufacturing. An additional approximately 0.33 acres of C-3, Corridor Commercial-zoned land to the west of the property, located at the southeast corner of Baldwin Avenue and E. Kennett, has been sold, as has 0.59 acres for a local tire business’ expansion.
Property Information
- Property Name: Fiero Industrial Land
- Address: 824 St. Clair Street, Pontiac, MI
- Contact for sale: Bruce Rasher
- Acreage: 18.84
- Description of Property: Flat, vacant industrial land ready for redevelopment.
-
Zoning/Tax ID Number(s):
M-2, Heavy Manufacturing: 14-20-201-204 (available); C-3, Corridor Commercial: 14-20-202-003 (sold), 14-20-202-005 (sold), 14-20-202-007 (sold), 14-20-202-002 (sold)
- Transportation: Railway, Seaport, Airport, Highway
- Regional Transmission Organization (RTO): Click here
- Public Utilities Commission (PUC): Click here
- Utilities: Electricity, Natural Gas, Municipal Sewer, Municipal Water
- Property Type: Vacant Land
- RACER Site ID: 11160
Supplemental Property Information
Helpful Resources
Environmental Information
2001-01-31 - 11160 - Pontiac North Fiero - Current Conditions Rpt. - Volume I of IV.pdf
2002-04-29 - 11160 - Pontiac North Fiero - RCRA Facility Investigation -RFI Report-MID005356910 - MID005356886 - MID085470102 - MID076331289.pdf
2003-11-26 - 11160 - Pontiac North Fiero - Supplemental RCRA Facility Investigation -RFI Report 1-MID005356910 - MID005356886 - MID085470102 - MID076331289.pdf
2007-04-30 - 11160 - Pontiac North Fiero-Figure 1.1 Site Location-USGS Quadrangle Map.pdf
2007-05-25 - 11160-Pontiac North Fiero-Rpt. LDD001-Drawing 3 of 5 - Tower Level Layout.pdf
2007-07-23 - 11160-Pontiac North Fiero-Rpt. LDD001-Drawing No. 1 - Topographic Survey.pdf
2007-11-30 - 11160 - Pontiac North Fiero-Rpt. LDD001-Drawing 5 of 5 - Coal Silo Over Main Building Layout.pdf
2007-12-05 - 11160 - Fiero Industrial Land - Location as Part of Pontiac North Campus.pdf
2008-01-09 - 11160 - Pontiac North Fiero-Rpt. LDD001-Drawing 1 of 5 - Basement Level Layout.pdf
2008-01-09 - 11160 - Pontiac North Fiero-Rpt. LDD001-Drawing 4 of 5 - Conveyor Building Layout.pdf
2008-08 - 017487_Phase_I_ESA_-_Kennett St Vacant_Property_Pontiac_MI.pdf
2020-07-16- Pontiac North - 11970 - Former Fiero Panhandle Env Summary_FINAL.pdf
2020-07-16- Pontiac North - 11970 - Former Fiero Panhandle Env Summary_FINAL.pdf
2020-07-17 - RACER Project Update-Fiero Off-Site VI Investigation.pdf
2020-11-06 - RACER Project Update - Pontiac North Fiero VI Investigation Results.pdf
2021-03-04 - Pontiac North - 11970 -2020 LNAPL_Tn Test_Memo_Final.pdf
2021-09-07 - Pontiac North - 11970 - Fiero Source Investigation SOW - Final.pdf
2021-09-08 - Pontiac North - 11970 -2021 Fiero VI CSM_Final.pdf
2022-01-20 - RACER Project Update - Fiero Off-Site VI Investigation - Final.pdf
2022-02-23-11970-Pontiac North-Fiero Temporary Monitoring Plan-Final.pdf
2022-04-08-11970-Pontiac North-Fiero Well Abandonment Recommendation_Final.pdf
2022-04-15 - Pontiac North - 11970 - 2021 PNC Properties Inspection Report_Final_reduced.pdf
2022-04-22 - 11160 - Fiero Powerhouse Env Summary_Final.pdf
2022-04-22-11970-Pontiac North Campus-Fiero Powerhouse Env Summary_FinalReduced.pdf
2022-07-21-11960-Pontiac North Campus-Fiero Supplemental SOW_Final.pdf
2022-09-07-11970-Pontiac North Campus-FTMP 2Q Results_Final.pdf
2022-12-14-11970-Pontiac North Campus-FTMP 3Q Results_final.pdf
2023-01-04 -11970 - RACER PNC ZVI Pilot Study Plan FINAL_REV.pdf
2023-03-20 - 11970 - RACER PNC ZVI Pilot Summary Final Draft.pdf
2023-03-20 - 11970 - RACER PNC ZVI Pilot Summary Final Draft.pdf
2023-04-21-11970-Pontiac North-2022 Fiero Groundwater Sampling Summary_final reduced.pdf
2023-07-25-Pontiac North-11970-CA Summary Report_DRAFT_for EPA_revised.pdf
2024-04-24-11960-Pontiac North Campus-PFAS Sampling Summary_Final_Reduced.pdf
2002-04-29 - 11160 - Pontiac North Fiero - RCRA Facility Investigation -RFI Report-MID005356910 - MID005356886 - MID085470102 - MID076331289.pdf
2003-11-26 - 11160 - Pontiac North Fiero - Supplemental RCRA Facility Investigation -RFI Report 1-MID005356910 - MID005356886 - MID085470102 - MID076331289.pdf
2007-04-30 - 11160 - Pontiac North Fiero-Figure 1.1 Site Location-USGS Quadrangle Map.pdf
2007-05-25 - 11160-Pontiac North Fiero-Rpt. LDD001-Drawing 3 of 5 - Tower Level Layout.pdf
2007-07-23 - 11160-Pontiac North Fiero-Rpt. LDD001-Drawing No. 1 - Topographic Survey.pdf
2007-11-30 - 11160 - Pontiac North Fiero-Rpt. LDD001-Drawing 5 of 5 - Coal Silo Over Main Building Layout.pdf
2007-12-05 - 11160 - Fiero Industrial Land - Location as Part of Pontiac North Campus.pdf
2008-01-09 - 11160 - Pontiac North Fiero-Rpt. LDD001-Drawing 1 of 5 - Basement Level Layout.pdf
2008-01-09 - 11160 - Pontiac North Fiero-Rpt. LDD001-Drawing 4 of 5 - Conveyor Building Layout.pdf
2008-08 - 017487_Phase_I_ESA_-_Kennett St Vacant_Property_Pontiac_MI.pdf
2020-07-16- Pontiac North - 11970 - Former Fiero Panhandle Env Summary_FINAL.pdf
2020-07-16- Pontiac North - 11970 - Former Fiero Panhandle Env Summary_FINAL.pdf
2020-07-17 - RACER Project Update-Fiero Off-Site VI Investigation.pdf
2020-11-06 - RACER Project Update - Pontiac North Fiero VI Investigation Results.pdf
2021-03-04 - Pontiac North - 11970 -2020 LNAPL_Tn Test_Memo_Final.pdf
2021-09-07 - Pontiac North - 11970 - Fiero Source Investigation SOW - Final.pdf
2021-09-08 - Pontiac North - 11970 -2021 Fiero VI CSM_Final.pdf
2022-01-20 - RACER Project Update - Fiero Off-Site VI Investigation - Final.pdf
2022-02-23-11970-Pontiac North-Fiero Temporary Monitoring Plan-Final.pdf
2022-04-08-11970-Pontiac North-Fiero Well Abandonment Recommendation_Final.pdf
2022-04-15 - Pontiac North - 11970 - 2021 PNC Properties Inspection Report_Final_reduced.pdf
2022-04-22 - 11160 - Fiero Powerhouse Env Summary_Final.pdf
2022-04-22-11970-Pontiac North Campus-Fiero Powerhouse Env Summary_FinalReduced.pdf
2022-07-21-11960-Pontiac North Campus-Fiero Supplemental SOW_Final.pdf
2022-09-07-11970-Pontiac North Campus-FTMP 2Q Results_Final.pdf
2022-12-14-11970-Pontiac North Campus-FTMP 3Q Results_final.pdf
2023-01-04 -11970 - RACER PNC ZVI Pilot Study Plan FINAL_REV.pdf
2023-03-20 - 11970 - RACER PNC ZVI Pilot Summary Final Draft.pdf
2023-03-20 - 11970 - RACER PNC ZVI Pilot Summary Final Draft.pdf
2023-04-21-11970-Pontiac North-2022 Fiero Groundwater Sampling Summary_final reduced.pdf
2023-07-25-Pontiac North-11970-CA Summary Report_DRAFT_for EPA_revised.pdf
2024-04-24-11960-Pontiac North Campus-PFAS Sampling Summary_Final_Reduced.pdf
Contact Our Managers
-
Grant Trigger Environmental
-
Bruce Rasher Redevelopment