Empowering America's Auto Communities

Racer Properties Information Hub

Fiero Assembly Plant

RACER has sold this property that includes frontage along Baldwin Avenue and is across the road from the Fiero Assembly Plant Parking Lots property. A 1.4 million square foot building was demolished by the buyer.

Property Information

  • Property Name: Fiero Assembly Plant
  • Address: 888 Baldwin Avenue, Pontiac, Michigan 48430
  • Acreage: 38
  • Description of Property: This 38-acre parcel has been sold, and includes frontage along Baldwin Avenue, across the road from the Fiero Assembly Plant Parking Lots property. A 1.4 million square foot building was demolished by the buyer.
  • Zoning/Tax ID Number(s):

    M-2, Heavy Manufacturing

    Tax ID’s 14-17-453-037, 14-17-453-036, 14-20-201-006

  • Facility ID: 11210

Environmental Information

1998-10-27-Pontiac North Fiero-11210-Parking Lots-Phase I ESA Ref No 13025-Final.pdf
2001-01-31-Pontiac North Fiero-11210-Current Conditions Report Fiero Area-Final.pdf
2001-01-31-Pontiac North Fiero-CCR Text a-Final.pdf
2002-04-29-Pontiac North Fiero-11210-RFI Report-Final.pdf
2003-11-25-Pontiac North Fiero-11210-Fiero Sample Locations Map-Final.pdf
2003-11-26-Pontiac North Fiero-11210-Corrective Measures Proposal-Final.pdf
2003-11-26-Pontiac North Fiero-11210-RFI Supplemental Doc-Final.pdf
2004-08-Pontiac North Fiero-11210-Phase I ESA Former Fiero Plant Parking Lot-Draft.pdf
2004-09-24-Pontiac North Fiero-11210-RFI Work Plan Addendum 13 Plant 17 Fiero AOI F-17-Final.pdf
2007-12-03-Pontiac North Fiero-11210-Redevelopment Demolition Areas Map-Final.jpg
2010-05-25-Pontiac North Fiero-11210-Phase I ESA Pontiac Fiero-Final.pdf
2015-06-30 - RACER Fiero Focused Corrective Measures Study - Final.pdf
2020-07-16- Pontiac North - 11970 - Former Fiero Panhandle Env Summary_FINAL.pdf
2020-07-17 - RACER Project Update-Fiero Off-Site VI Investigation.pdf
2020-11-06 - RACER Project Update - Pontiac North Fiero VI Investigation Results.pdf
2021-03-04 - Pontiac North - 11970 -2020 LNAPL_Tn Test_Memo_Final.pdf
2021-05-14 - Pontiac North - 11970 - Fiero VI Investigation Report - FINAL.pdf
2021-09-07 - Pontiac North - 11970 - Fiero Source Investigation SOW - Final.pdf
2021-09-08 - Pontiac North - 11970 -2021 Fiero VI CSM_Final.pdf
2022-01-20 - RACER Project Update - Fiero Off-Site VI Investigation - Final.pdf
2022-02-23-11970-Pontiac North-Fiero Temporary Monitoring Plan-Final.pdf
2022-04-08-11970-Pontiac North-Fiero Well Abandonment Recommendation_Final.pdf
2022-04-15 - Pontiac North - 11970 - 2021 PNC Properties Inspection Report_Final_reduced.pdf
2022-07-21-11960-Pontiac North Campus-Fiero Supplemental SOW_Final.pdf
2022-09-07-11970-Pontiac North Campus-FTMP 2Q Results_Final.pdf
2022-12-14-11970-Pontiac North Campus-FTMP 3Q Results_final.pdf
2023-01-04 -11970 - RACER PNC ZVI Pilot Study Plan FINAL_REV.pdf
2023-01-04 -11970 - RACER PNC ZVI Pilot Study Plan FINAL_REV.pdf
2023-03-20 - 11970 - RACER PNC ZVI Pilot Summary Final Draft.pdf
2023-03-20 - 11970 - RACER PNC ZVI Pilot Summary Final Draft.pdf
2023-04-21-11970-Pontiac North-2022 Fiero Groundwater Sampling Summary_final reduced.pdf
490700000-CS1-00.dwg
490700000-GB1-00.dwg
490701803-0301473-G-0-001XX00 (1).DWG
490701803-0301473-G-0-001XX00.DWG
490701803-0301473sf1-002xx (1).dwg
490701803-0301473sf1-002xx.dwg
490701803-0301473sf1-003xx (1).dwg
490701803-0301473sf1-003xx.dwg
490701803-0301473sf1-004xx (1).dwg
490701803-0301473sf1-004xx.dwg
490701803-0301473sf1-008xx (1).dwg
490701803-0301473sf1-008xx.dwg
490701803-0301473sf1-009xx (1).dwg
490701803-0301473sf1-009xx.dwg
490701803-0301473sf1-r1 (1).dwg
490701803-0301473sf1-r1.dwg
490701803-AE1-01.dwg
490701803-AE1-02.dwg
490701803-AE1-M1.dwg
490701803-AE1-R1.dwg
490701803-GA1-01.dwg
490701803-GB1-00.dwg
490701803-GL1-00.dwg
490701803-GR1-01.dwg
490701803-GR1-02.dwg
490701803-GR1-M1.dwg
490701803-IF1-01.dwg
490701803-IF1-02.dwg
490701803-IF1-M1.dwg
490701803.dwg
490701803.TXT
4907_Pontiac Fiero Site - WFG Warehouse.xlsx
DRAWING FLOOR 2
dwg bldg 17.dwg